Focus on greenhouse design, research and development,

material production, greenhouse material OEM, global delivery and customized greenhouses

SEARCH WHAT YOU WANT
Multi-span Film Greenhouse
Tunnel Greenhouse
Glass Greenhouse
Venlo Greenhouse
Polycarbonate Greenhouse
Heat-Preservation Greenhouse With Chinese Characteristics
Container Plant Greenhouse
Photovoltaic Greenhouse
A- Insulated Greenhouse
Animal Husbandry Greenhouse
Blueberry Rain Shelter Greenhouse
Plant Planting System
Heating and Cooling System

Heating And Cooling System

Application:

Greenhouse, Poultry house, Dairy farm, Industrial use etc.

Application:

Greenhouse, Poultry house, Dairy farm, Industrial use etc.

Cooling System:

Use evaporation cooling principle of water to realize cooling. There is a specially-made cooling pad wallWhen the air penetrates wet curtain medium, it conducts heat exchange with vapor on moist medium surfaceso as to realize humidification and cooling for the air

 

Parameters:

Cooling fan

1380mm*1380mm*1380mm,44000 m3/h,1.1KW

Cooling pad

100% wood pulp paper,0.15mm thickness,1.5m-2m height

Circulation fan

400mm,5300 m3/h,0.18KW

Cooling effect

10-15℃

 

Heating System:

The circulating combustion technology is used for the series of boilers which are developed by our companythrough high technology. As a result, it makes combustion become more sufficient and it increases heating area inthe furnace at the same time. Thus, a lot of hot water can be produced in a short time. High technology is used toconduct computer temperature control technology. Water supply through automatic control is realized. Besidesoutlet water temperature can be regulated at will so as to realize automatic temperature regulation. lf it is matchedwith water heating air conditioning, it can reach better effect (energy saving, environmental protection and health).

 

Parameters:

Quantity of heat

1.8 million calories

Power

2.1 MW

Gas

Maximum gas capacity

180 cubic metre per hour

Normal gas capacity

100-120 cubic metre per hour

Fuel oil

Maximum fuel capacity

180 KG per hour

Normal fuel capacity

100-120 KG per hour

Coal

Maximum coal capacity

400 KG per hour

Normal coal capacity

190-240 KG per hour

Dimension

5.1m*1.75m*2.15m

Induced draft fan power

15 KW

Cooling System:

Use evaporation cooling principle of water to realize cooling. There is a specially-made cooling pad wallWhen the air penetrates wet curtain medium, it conducts heat exchange with vapor on moist medium surfaceso as to realize humidification and cooling for the air

 

Parameters:

Cooling fan

1380mm*1380mm*1380mm,44000 m3/h,1.1KW

Cooling pad

100% wood pulp paper,0.15mm thickness,1.5m-2m height

Circulation fan

400mm,5300 m3/h,0.18KW

Cooling effect

10-15℃

 

Heating System:

The circulating combustion technology is used for the series of boilers which are developed by our companythrough high technology. As a result, it makes combustion become more sufficient and it increases heating area inthe furnace at the same time. Thus, a lot of hot water can be produced in a short time. High technology is used toconduct computer temperature control technology. Water supply through automatic control is realized. Besidesoutlet water temperature can be regulated at will so as to realize automatic temperature regulation. lf it is matchedwith water heating air conditioning, it can reach better effect (energy saving, environmental protection and health).

 

Parameters:

Quantity of heat

1.8 million calories

Power

2.1 MW

Gas

Maximum gas capacity

180 cubic metre per hour

Normal gas capacity

100-120 cubic metre per hour

Fuel oil

Maximum fuel capacity

180 KG per hour

Normal fuel capacity

100-120 KG per hour

Coal

Maximum coal capacity

400 KG per hour

Normal coal capacity

190-240 KG per hour

Dimension

5.1m*1.75m*2.15m

Induced draft fan power

15 KW

About Production

The greenhouse production cycle is usually 15-30 days after payment/advance payment is received. Depends on specific project.

 

About Transportation

Usually loading by container shipping by sea.

 

About Payment

Terms of payment: 40% T/T in advance, 60% payment before shipment.  

Next Page: No More

Save time! Get the best deal

 

Please fill in the following information, we will contact you as soon as possible after receiving the information, thank you for your message!

* Name
Phone
* Email
Company
* Message